Chiller & boiler plants
Air- and water-cooled, 20–1,200 tons, staged changeovers with no tenant downtime.

Buildings
Engineering, install and planned maintenance for portfolios that cannot afford a warm afternoon.
Air- and water-cooled, 20–1,200 tons, staged changeovers with no tenant downtime.
Standardised RTU programs across multi-site portfolios with shared parts stock.
Niagara, BACnet and Modbus integration, plus sequence-of-operation rewrites.
Measure, tune and document — typical 12–19% energy reduction in year one.
Harbour Point Tower
1,100-ton chiller replacement
0 tenant downtime hours
Kellner Cold Storage
Ammonia plant controls retrofit
22% kWh reduction
District 9 Schools
38-building RTU program
4-year contract, 99.2% uptime
Send drawings or an equipment list and we return a scoped budget within five business days.